Down from the top edge at each stud no more than 16 in.
Attaching hardie siding to metal studs.
Use 6d or 8d galvanized or stainless siding nails and install a single nail about 1 in.
Fasteners shall be installed between 1 in.
It s best to stagger the joints in each successive course to avoid noticeable patterns.
How to attach hardie board siding.
The hardienail studless siding fastening system is a new innovative method for quickly and securely installing james hardie fiber cement siding.
If you can easily fit your hand underneath your hardie siding 9 times out of 10 that s because the installer didn t nail the boards properly.
Hardiepanel vertical siding must be joined on stud.
I have been thinking about using steel studs on some of my stuff interior non load bearing walls.
Into the solid wood wood sheathings like osb and plywood count toward the 1 1 4 in but soft sheathings like fiber board and foam don t.
Form a piece of plastic strapping into a loop on one end of the strap large enough for sliding the siding into.
The thin starter strip is installed level with the roof of the building but.
Guide to attaching exterior wall coverings through foam sheathing to wood or steel wall framing.
How to stagger lap siding for walls longer than 12 feet you ll need to butt additional lengths of siding together.
Install the starter strip for the hardie board siding.
From the top edge and no closer than 3 8 in.
Hardi can be installed over steel studs.
If you were not going to use a rainscreen system then i would think some type of ss screw would be the best alternative for securing the siding to the studs.
Cut the sheet if necessary using a circular saw mounted with a carborundum masonry blade to ensure that both vertical edges of the backerboard align with a metal stud for stable backing.
Butt joints in adjacent courses should be spaced apart by at least two stud bays for 16 inch o c.
James hardie prefers and recommends installation of hardieplank lap siding by the blind nailing technique such that fasteners are hidden by the course above.
When screws are used to attach panels to steel studs furring the screws shall have wing tips.
Fastening to a stud is not required.
Self drilling self tapping screw fasteners for connection of siding to steel framing shall comply with the requirements of aisi s200.
Double stud may be required to maintain minimum edge nailing distances.
Most of the james hardie installation requirements in canada are designed to deal with excess moisture.
Framing or one bay for 24 inch o c.
Step 2 position the backerboard sheet against the wall surface and use a builders level to level the panel.
Steel stud 8 screw 0 285 head steel thickness 3 threads.
From the ends of the plank.
The hardienail features paslode s patented tetragrip fastening technology which allows siding installers to fasten directly to osb sheathing.
I believe they require plywood sheeting a wrb.